45 results
40-F
2023 FY
EX-99.1
HBM
Hudbay Minerals Inc.
28 Mar 24
Annual report (Canada)
10:08am
for operations, in addition to water recycled from the TMF, is pumped from the Similkameen River. Property elevations range from approximately 770 m above sea
6-K
EX-99.2
HBM
Hudbay Minerals Inc.
6 Dec 23
Current report (foreign)
3:00pm
. Electrical power from the provincial grid is connected to the property. Supplemental water for operations, in addition to water recycled from the TMF … operating east of the Similkameen River.
Concentrator process water is recycled from the TMF pond, with additional make-up water pumped from the Similkameen
6-K
EX-99.2
HBM
Hudbay Minerals Inc.
11 Sep 23
Hudbay De-risks Copper World Phase I with Enhanced Pre-Feasibility Study
4:26pm
scavenger tails were not recycled to the rougher. The chosen cleaner flotation protocol is:
SIBX 1 g/t (with respect to rougher feed)
Natural pH … recycled back to the extraction stage and the rich electrolyte discharging to the electrowinning stage.
The rich electrolyte will be recirculated through
6-K
EX-99.1
HBM
Hudbay Minerals Inc.
18 Jul 22
Current report (foreign)
4:46pm
to the process water tank for recycling and underflow is pumped to the copper sulfide concentrate storage tank (or recycled to the thickener feed … reports to the process water tank for recycling, while the thickener underflow is pumped to the molybdenum concentrate storage tank (or recycled
40-F
2021 FY
EX-99.1
HBM
Hudbay Minerals Inc.
28 Mar 22
Annual report (Canada)
6:24pm
, iron, and sulphur. Wastewater is treated and recycled through the zinc plant. We expect the zinc plant to be closed around the time the 777 mine
6-K
EX-99.1
u7b3wi 9x5gkf3r
30 Mar 21
Lalor and Snow Lake Operations, Manitoba, Canada Form 43-101F1 Technical Report
5:11pm
40-F
EX-99.1
mkazrie353u20cj6r1ao
30 Mar 21
Annual report (Canada)
6:04am
40-F
EX-99.1
ogumffi8 1re
31 Mar 20
Annual report (Canada)
12:31pm
40-F
EX-99.1
rux3wlhor6s2hqt0qnz
1 Apr 19
Annual report (Canada)
12:00am
40-F
EX-99.1
i3f23qf13tlwi8l ec
30 Mar 18
Annual report (Canada)
12:00am
6-K
EX-99.2
fshaoggtpc1
4 Apr 17
Hudbay Provides Update on Operations and Growth Projects
12:00am
40-F
EX-99.1
g5m4qio1 jbg1
31 Mar 16
Annual report (Canada)
12:00am
40-F
EX-99.1
4cbx db3q
31 Mar 14
Annual report (Canada)
12:00am
40-F
EX-99.1
uxd9wj
28 Mar 13
Annual report (Canada)
12:00am
6-K
EX-99.1
082g2 8xnli
2 Apr 12
Pre-Feasibility Study Technical Report, on the Lalor Deposit, Snow Lake, Manitoba, Canada
12:00am
40-F
EX-99.1
4g7us5pbirs
2 Apr 12
Annual report (Canada)
12:00am
40-F
EX-99.3
na4o230v11rh1
2 Apr 12
Annual report (Canada)
12:00am
6-K
EX-99.1
9yqfgc9im4mldamd
8 Mar 12
Current report (foreign)
12:00am
6-K
EX-99.2
mg4ok6dkn5jovv7n5kk
3 Nov 11
Unaudited Condensed Consolidated Interim Financial Statements
12:00am
6-K
EX-99.2
jtsozkradbo372
10 Aug 11
Unaudited Condensed Consolidated Interim Financial Statements
12:00am